Project information

  • Project: syria
  • Client: Sedic

Project Details

1-Hamidho Melting shop :

commissioning and start up for the oxygen plant and readjust both the scada and plc programs to actual system installed (redundant plcs3007; wincc scada)

2-Abanoub for rebar rolling Mill :

a) installing the bar counter system for the number of bars

b) enhance the quality system by working on the weighing and tracking system for the product until we sell the product to the client.

c) re-adjust the optimization system to improve the prober length over the cooling bed.

d) in three months we reach almost the maximum capaity for the line 35 ton/hour for the rehrating furnace.