Project information

  • Project: Baliyna waste water station
  • Client: Sedic

Project Details

• We make the system works automatically with Beck Off plc and make a Scada system with Movicon Scada which allows the operator to monitor and run the whole station from the control room .

• We connect the central office to the staion so that all reports and operation stauts monitored by the GM

- We made an Ethernet Network between the PLCs as the picture As ten PLCs for Filters and three PLCs for Raw, Treated water, the master which control filters and one for chlorine